strip

Department of MSME&T had accorded approval to WBSIDC to set up an Integrated Silk Park at Ramchandrapur-Madhughat, Malda over an area of about 15 acres vide letter under reference for implementation of the subject project as one of its own Industrial Estate vide letter no. 1290/C-IV/9S-14/10 dated 19.06.2014

 

The proposed location is at Ramchandrapur-Madhughat which is about 9.5 Km. south of Malda town on Siliguri – Kolkata National Highway, NH-34. The Site is available in 2 different patches in both side of the national Highway 34. The Eastern side of the road is about 9.48 Acres and the Western side is 4.39 Acres.

Block Components

  • SDF Building.
  • Transformer Room.
  • Ware House.
  • CEPT.
  • CFC Building.
  • Pump House.
  • Guard Room.
  • Toilet Block.
  • Road.
  • Drainage System.
  • Water supply System.
  • Fire Fighting System.
  • Underground Reservoir.
  • Street light with Electrification.
  • Parking.
  • Plot and Land Beautification.

West Block Components

  • Office Building.
  • Shopping Complex.
  • Ware House.
  • Canteen Block.
  • Silk Haat.
  • Pump House.
  • Guard Room.
  • Toilet Block.
  • Road.
  • Drainage System.
  • Water supply System.
  • Fire Fighting System.
  • Underground Reservoir.
  • Street light with Electrification.
  • Parking.
  • Pond and Land Beautification.